Electronic Data Systems, an HP company     (January 1995 - Present)
Project Manager

  • Delivered Multi-million dollar project transitioning existing parts from an expensive GM part distribution center to a low cost third party solution. Managed over 45 resources, including a large offshore component. Directed two Project Managers and five technical leads successfully in delivering a flawless implementation of over 1,000 configuration items. Saved GM nearly $3 million per year in warehousing, distribution, and shipping costs
  • Created a warehousing and distribution system utilizing SAP to save GM nearly $250,000 a year
  • Eliminated an ineffective regional Latin America/Africa/Middle East (LAAM) Engineering system and replaced it with a Global Engineering Solution saving GM nearly $500,000 per year
  • Developed a Global Engineering system that met the needs of North America, South America, Africa, Europe, Asia, and Australia saving GM nearly $3 Million per year
  • Transitioned slow moving parts stocked at the Lansing Parts Plant to Memphis saving GM nearly $1 million dollars per year in warehousing and shipment costs
  • Instituted a Service Part Catalog Translation Memory database to create translated service parts catalogs in Spanish and French
  • Replaced the Mexico Engineering system with a North American solution, creating a cost savings of nearly $300,000 for GM
  • Established consistent communication paths between the GM Business team, IBM, WIPRO, INFOR, GM Information Systems & Services group, and other vendors
  • Instilled trust in the entire team and created a team concept
  • Requested by team members as their project manager on multiple projects
  • Demanded by customers for high profile and problematic projects
  • Displayed honesty, integrity, care, and concern towards each team member
  • Delivered the following projects for GM at the SPO Site over the past 14 years:
    o South American Planning Center Phase 2
    o Engineering Release and Publications Activity LAAM
    o GSPS World Book
    o Engineering Release And Publications Activity GME )
    o Global Purchasing System Version 8.0 Upgrade
    o Lansing to Memphis Volume Shift (LMVS) Project )
    o Consignment Integration Activity (CIA) Project )
    o Online Work Documents (OLWD) Release 3
    o GSPS North American Dealer Catalog Translation
    o North American Service Parts Engineering and Publication DTM
    o North American Service Specification Engineering Consolidation
    o New Facility Project
    o Common Service Parts System (CSPS)
Information Analyst
  • Responsible to gather business and system requirements, design, code, test, and implement systems.
  • Designed the data conversion from Brazil into the carline and truck line usage information, the assembly and component systems, and the parts classification databases.
  • Integrated the Isuzu service parts into the GM Engineering systems.
  • Removed the EPG system from GM's Service Parts Operations. This system elimination created a savings of $20,000 a year to GM.
  • Information Analyst at EDS for the following Projects:
    o Brazil Project
    o Isuzu Project
    o Elimination of the EPG system project

Burroughs / Unisys (Burroughs / Sperry merger in 1986 to form Unisys)     (June 1985 - January 1995)
Information Analyst/Senior Information Business Analyst/Project Leader

  • Responsible to determine requirements, design, coding, testing, and implementatio
  • Created a World Call Management system of all Unisys equipment worldwide creating over $100 million per year in warranty sales
  • Created and maintained a data warehouse of all products sold by Unisys containing approximately 17 million records (machines)
  • Maintained the revenue recognition, maintenance billing reconciliation, transaction activity reporting verification, special projects, customer invoices, rate increase letters, for over $1 billion dollars of maintenance agreement contracts
  • Eliminated costly tape shipments by implementing an electronic data file transfer to create the central data store saving nearly $100,000 per year
  • Information Analyst at Unisys for the following Projects:
    o World Call Management
    o Installed Products Database
    o Maintenance Agreement Billing System
    o Corporate Performance Reporting System